PPC 2000 'Standard form of contract for project partnering', was the first standard form Project Partnering Contract developed following the government’s Construction Task Force report, Rethinking construction, published in 1998, which suggested that the industry was under-achieving and proposed:
- Integrated project processes.
- Decent and safe working conditions.
- Improved management and supervisory skills.
- Replacing competitive tendering with long-term relationships.
- Public sector bodies should become best practice clients.
Partnering is a broad term used to describe a collaborative management approach that encourages openness and trust between parties to a contract. It is most commonly used on large, long-term or high-risk contracts.
PPC 2000 was launched in September 2000 by the chairman of the Construction Task Force, Sir John Egan. It was formulated by the Construction Industry Council (CIC) in collaboration with the Association of Consultant Architects (ACA). It is published by the Association of Consultant Architects, and is a joint venture with the Association of Consulting Engineers (ACE). They also publish TPC 2005, the first standard form Term Partnering Contract launched by Sir Michael Latham, author of the 1994 Latham report. TPC 2005 applies the principles adopted by PPC 2000 to term contracts (TPC 2005 was superceded by Term Alliance Contract 1 in 2017).
PPC 2000 pilot schemes were undertaken before its initial implementation, on a range of housing, office and school projects, including refurbishments and new builds in both the public and private sectors. PPC 2000 was amended in 2003, 2008 and most recently in 2013.
PPC 2000 provides a pathway for the partnering process. It creates a single contractual hub that allows all team members to contract on the same terms. It aligns project management processes, methods and behaviour covering all project stages from design to completion. Trust and cooperation are encouraged and promoted through PPC 2000.
Clients, consultants, contractors, and specialists are brought together under a single multi-party contract which eliminates the need for clients to sign different bilateral contracts. A joining agreement is signed by additional team members that join the project, and specialist sub-contractors sign an SPC 2000 agreement. A commencement agreement confirms whether or not the project is ready to proceed on site.
Project progress is monitored and reviewed by a core group which reaches decisions by consensus. Early warning of potential problems can be given to the core group to minimise and avoid disputes.
PPC 2000 contracts promote early planning, clear pricing and integrated teamwork to achieve:
- Reduced capital and whole life costs.
- More sustainable solutions.
- Quicker design, supply and construction.
- Fewer defects and better quality.
- Fewer accidents.
- Respect for people.
- More predictable outcomes.
- Higher productivity and profitability.
- Better incentivisation.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- ACASFA 2012.
- Association of Consultant Architects.
- BS11000.
- Collaborative practices.
- Construction 2025.
- Construction contracts.
- Construction Industry Council.
- Construction Task Force.
- Framework agreement.
- Government Construction Strategy.
- Integrated Project Team.
- Latham Report.
- NEC3.
- Partnering and joint ventures.
- Partnering.
- Procurement route.
- Rethinking Construction 2002: Achievements, Next Steps, Getting Involved.
- Rethinking construction.
- SPC 2000.
- Team management.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.